Interstate 70 Closed Downtown This Weekend

Interstate 70 EB & WB between SR 315 and I-71 will close this weekend beginning Friday night to demolish the Grant St. Bridge. By Sunday morning, weather permitting, the entire concrete bridge deck will be gone, and the only thing remaining will be the steel beams. Those beams will be removed during overnight closures within the next few weeks.

The new Grant St. Bridge -- which is expected to open in about nine months -- is one in a series of ODOT projects to improve the I-70/71 corridor through downtown Columbus.

This weekend's closure will have I-70 EB closed until Sunday morning; I-70 WB will be open Saturday morning. Below is a graphic of the closure and more specific details.

graphic

 

 

INTERSTATE 70 WEEKEND CLOSURES

8 PM FRIDAY FEBRUARY 2, 2018, the following ramps will close:

  • Third St. to I-70 EB. Detour: Third St. to Livingston Ave. to I-70 EB
  • Broad St. to I-71 SB. Detour: I-71 NB to I-670 WB to SR 315 SB to I-71 SB.

8:30 PM, the following ramp will close: 

  • Greenlawn Ave. to I-71 NB. Detour: I-71 SB to SR 104 to I-71 NB to SR 315 NB to I-670 EB to I-71 NB.

9 PM, the following ramps will close  EASTBOUND : 

  • SR 315 SB to I-70 EB. Detour: I-670 EB to I-71 SB to I-70 EB.
  • I-71 NB to I-70 EB. Detour: I-71 NB to SR 315 NB to I-670 EB to I-71 SB to I-70 EB.  For traffic to continue on I-71 NB, take SR 315 NB to I-670 EB to I-71 NB.
  • I-70 EB AT I-670 EB. Detour:  I-670 EB to I-71 SB to I-70 EB

WESTBOUND

  • I-70 WB CLOSED BETWEEN I-71 & SR 315 Detour: I-71 NB to I-670 WB to SR 315 SB to I-70 WB
  • I-71 SB to I-70 WB. Detour I-71 SB to I-670 WB to SR 315 SB to I-70 WB. For traffic to continue on I-71 SB, take I-670 WB to SR 315 SB to I-71 SB.

9 AM SATURDAY FEBRUARY 3, 2018

  • I-70 WB all lanes open
  • I-71 SB to I-70 WB open
  • Broad Street to I-71 SB open

9 AM SUNDAY FEBRUARY 4, 2018

  • I-70 EB all lanes and ramps open

(ODOT)

I-270 South Pavement Repairs on the Northwest Side

Starting Tuesday next week, ODOT will make more permanent pavement repairs on the Northwest Side Widening Project using asphalt instead of 'cold mix' since it lasts longer.

Traffic will be impacted during the day Tuesday and Wednesday, but not until 9 AM after the morning commute.

 

Tueday, Jan. 30: I-270 SB between Tuttle Crossing Blvd. and Cemetery Road

9 AM: I-270 south will be reduced to two lanes and the ramp from Tuttle Crossing Blvd. to I-270 south will close. The detour is I-270 north to Sawmill Road to I-270 south.

1 PM: The ramp from Tuttle Crossing Blvd. to I-270 south will reopen. 

2 PM: The following ramps will close -

  • Ramp from Cemetery Road to I-270 south
    The detour is I-270 north to Tuttle Crossing Blvd. to I-270 south.

  • Ramp from I-270 south to Cemetery Road
    The detour is I-270 south to Roberts Road to I-270 north to Cemetery Road.

4 PM: All lanes and ramps open

 

Wednesday, Jan. 31: I-270 NB between Davidson Road and Tuttle Crossing Blvd.

9 AM: I-270 north will be reduced to two lanes. All ramps will remain open.

12 NOON: All lanes open.

I-70 Overnight Closures Downtown

I-70 will experience overnight closures in the downtown area beginning tonight and lasting through the week, predominantly from 11 p.m. to 5 a.m. With the concrete bridge deck gone, it's now time to remove the steel beams from the old Grant St. Bridge in downtown Columbus. Work will occur during overnight hours, weather permitting, because traffic volumes are the lightest. 

  • I-70 westbound will have a complete closure Monday through Thursdays nights
  • I-70 eastbound will have a complete closure Wednesday and Thursday nights.

Below are further details from ODOT on how traffic will be maintained during demolition:

 

 

MONDAY FEBRUARY 12, 2018

  • 9 PM: I-70 EB reduced to two lanes between I-71 and SR 315
  • 9 PM: Ramp from Broad St. to I-71 SB closed. Detour: Broad St. to I-71 NB to I-670 WB to SR 315 SB to I-71 SB.
  • 11 PM: All lanes of I-70 WB closed between the east split and SR 315. I-70 WB traffic will be re-routed using I-71 NB to I-670 WB to SR 315 SB to I-70 WB.
  • At 11 PM, the following ramp will close:
  • I-71 SB to I-70 WB Detour: I-71 SB to I-670 WB to SR 315 SB to I-70 WB.
  • 5 AM: all lanes and ramps open.

TUESDAY FEBRUARY 13 - WEDNESDAY FEBRUARY 14

By 11 PM both I-70 EB & WB will be closed between I-71 (east split) and SR 315 (west split).

  • At 8 PM the following ramps will close: 
  • Broad St. to I-71 SB Detour: I-71 NB to I-670 WB to SR 315 SB to I-71 SB
  • 3rd St. ramp to I-70 EB Detour: Third St. to Livingston Ave. to I-70 EB
  • At 10 PM, the following ramps will close:
  • SR 315 SB to I-70 EB Detour: I-670 EB to I-71 SB to I-70 EB
  • Greenlawn Ave. ramp to I-71 NB Detour: I-71 SB to SR 104 to I-71 NB to SR 315 NB to I-670 EB to I-71 NB
  • At 11 PM, all lanes of I-70 EB at I-670 are closed. Detour: I-670 EB to I-71 SB to I-70 EB
  • At 11 PM, all lanes of I-70 WB at I-71 NB are closed. Detour: I-71 NB to I-670 WB to SR 315 SB to I-70 WB
  • At 11 PM, the following ramps are closed:
  • I-71 NB to I-70 EB Detour: I-71 NB to SR 315 NB to I-670 EB to I-71 SB to I-70 EB
  • I-71 SB to I-70 WB Detour: I-71 SB to I-670 WB to SR 315 SB to I-70 WB.
  • By 5 AM each morning, all ramps and lanes of I-70 EB & WB are open.  

THURSDAY FEBRUARY 15 - FRIDAY, FEBRUARY 16, 2018

  • At 8 PM, the following ramp will close:
  • Third St. to I-70 EB Detour: Third St. to Livingston Ave. to I-70 EB
  • At 10 PM, the following ramps will close:
  • SR 315 to I-70 EB Detour: I-670 EB to I-71 SB to I-70 EB
  • Greenlawn Ave. ramp to I-71 NB Detour: I-71 SB to Rt. 104 to I-71 NB to SR 315 NB to I-670 EB to I-71 NB. 
  • At 11 PM, all lanes of I-70 EB at I-670 are closed. Detour: I-670 EB to I-71 SB to I-70 EB.
  • At 11 PM, the following ramp is closed: 
  • I-71 NB to I-70 EB Detour: I-71 NB to SR 315 NB to I-670 EB to I-71 SB to I-70 EB
  • 5 AM each morning all ramps and lanes open.

Changes to Greenlawn Avenue Exit Begin this Friday

Starting Friday, April 27, there will be a new change for south side drivers trying to exit at Greenlawn Avenue. The exit to Greenlawn will only be open to drivers coming from Interstate 70 east or westbound. State Route 315 south drivers will not be able to exit at Greenlawn. Instead, they will use the next exit, which is Route 104 or Frank Road. 

The change is for safety. During construction, there simply isn't enough pavement coming from SR 315 south to safely merge across so many lanes of traffic to exit at Greenlawn exit. 

During construction and in its permanent configuration, the ramp to Greenlawn Avenue has shifted.

The South Side Mega Fix project, which began last year, is adding a lane in both directions of Interstate 71 between SR 315 and Stringtown Road and building new ramps at the Interstate 71 & 270 Interchange. 

The project is expected to be completed in 2020. 

(ODOT)

Capital City Half Marathon Road Closures

The Capital City Half Marathon, Quarter Marathon, and Commit To Be Fit 5K will take place Saturday, April 28, beginning at 8 a.m.  Street closures will be in place in preparation for this large event beginning Friday evening, April 27. Long rolling closures will be in place along the routes during the events. Please plan for delays, consider alternate routes; be alert for closures and watch for extra pedestrian and bicycle traffic downtown and near the routes. Participants and spectators are encouraged to carpool or use COTA to reduce congestion and parking delays.

A video of the route can be found here: https://www.youtube.com/watch?v=JSxlodcSw1s

Course maps, including the details of the entire half marathon route, can be found here: http://capitalcityhalfmarathon.com/maps.shtml 

The start of the race is at High Street and Town Street. 

Road Closures:
In preparation for the event, the following roads will be closed to through-traffic from Friday evening starting as early as 5 p.m., April 27, to 2 p.m. Saturday, April 28:

  • S. High Street between State Street and Rich Street (Closed from 5 p.m. Friday)
  • S. High Street between State Street and Broad Street (Closed from 6 p.m. Friday)
  • W. Town Street between High Street and Front Street (Closed from 5 p.m. Friday)
  • Rich Street between High Street and 3rd Street (Closed 6 p.m. Friday)

Expect long rolling closures along following routes, especially near the beginning of each course.

There will be special duty law enforcement officers directing traffic along the routes. Officers will direct traffic across the routes when possible. Opportunities to cross the route will be largely unavailable near the beginning of each course. 

(City of Columbus)

4th Street Closed South of Hudson

North 4th Street is closed between E Maynard Avenue to E Tompkins Street (south of Hudson) because of a water main break. Please consider an alternate route, especially during end-of-the-day rush hour.

Additionally, the Department of Public Utilities has issued a boil water advisory for approximately 65 properties in the area.

I-270 South Closed on Northeast Side

 I-270 SB is closed at SR 161. The ramps from SR 161 EB & WB to I-270 SB are also closed along with ramps from Morse Rd. and Easton Way to I-270 SB due to a fatal crash. Duration: Hours

Red, White & BOOM! 2018

Red, White & Boom will take place Tuesday, July 3rd downtown.

To ease the flow of heavy vehicle traffic, parking restrictions will be in place on numerous downtown streets before, during and immediately after Red, White & BOOM! Most parking restrictions will be in place by Tuesday, July 3, at 8 a.m. Signs will be posted in these areas to remind motorists that there will be no overnight parking. Any vehicles that remain beginning at 8 a.m., Tuesday, July 3, will be ticketed and towed.  During the hours of parking restrictions, parking meters will be bagged and temporary “No Parking” signs will be posted where no meters are present.

Maps of Red, White & BOOM! street closures and parking restrictions are available HERE.

Beginning at 5 p.m., Tuesday, July 3, all streets within the following boundaries will be closed:

  • North:  Spring Street
  • South: Mound Street
  • West:  McDowell Street
  • East:    3rd Street

All closed streets will reopen at 12:01 a.m., Wednesday, July 4.

Long Street will be open from 6-9 a.m. on Monday, July 2, Tuesday, July 3.

Motorists are reminded to be alert for pedestrians and bicyclists traveling to and from Red, White & BOOM! activities. Motorists and bicyclists must obey all traffic laws and, by law, must share the road legally and safely. Bicyclists riding after sunset and before sunrise are required by law to have operational headlights, taillights and reflectors on their bikes. 

The Central Ohio Transit Authority (COTA) will provide expanded public transportation to Red, White & BOOM! on Tues., July 3 with express service from Park & Rides, local service and extended CBUS® service. Express service to Downtown from select Park & Ride locations will begin at 5 p.m. and continue until 8:30 p.m. Before the fireworks, there will be an improved frequency of service traveling Downtown on most local service until approximately 9 p.m. After the fireworks, buses will leave Downtown from designated Red, White & BOOM! boarding zones at approximately 10:45 p.m., 11:30 p.m. and midnight. Boarding zones will be posted in downtown High Street bus shelters. For more information on COTA service, click HERE.

For more information on Red, White & BOOM!, click HERE

Interstate 270 between Hilliard and Dublin lane and ramp closures tonight

The Interstate 270 project between Hilliard and Dublin will reach a major milestone tonight. Weather permitting, northbound 270 traffic will be switched onto new pavement so crews can complete construction on the outside lanes. To make this happen, several ramps and lanes will be closed. Details below. 

The project that will add a lane in each direction of I-270 between Hilliard and Dublin is set to be complete this fall.

FRIDAY JULY 13, 2018

  • 7 PM: I-270 NB reduced to two lanes between Cemetery Rd. and US 33
  • 7 PM: The following ramps will close:
  • I-270 NB to Cemetery Rd. EB
    Detour: I-270 NB to  Sawmill Rd. to I-270 SB to Cemetery Rd.
  • I-270 NB to US 33 EB
    Detour: I-270 NB to Sawmill Rd. to I-270 SB to US 33 WB
  • 8 PM: Ramp from I-270 NB to Cemetery Rd. WB closes.
    Detour: I-270 NB to Sawmill Rd. to I-270 SB to Cemetery Rd. WB.
  • 9 PM: Ramp from I-270 NB to Tuttle Crossing Blvd. closes.
    Detour: I-270 NB to Sawmill Rd. to I-270 SB to Tuttle Crossing Blvd. 
  • 10 PM: I-270 NB is reduced to one lane
  • 10 PM: The following ramps will close:
  • Ramp from Cemetery Rd. WB to I-270 NB closes
    Detour: I-270 SB to Roberts Rd. to I-270 NB
  • Ramp from Tuttle Crossing Blvd. to I-270 NB closes
    Detour: I-270 SB to Roberts Rd. to I-270 NB
  • 8 AM SATURDAY: All ramps are open and I-270 NB is reduced to two lanes between Cemetery Rd. and US 33. 
  • 11 AM SATURDAY: All lanes on I-270 NB are traveling on new pavement.

All lanes of I-71 north are closed at I-270 on the north side

I-71 North Update

I 71

 

All lanes of I-71 north are closed at I-270 on the north side due to the crash north of Polaris/Gemini. The following ramps are also closed:

  • I-270 east or west to I-71 north
  • Polaris/Gemini to I-71 north

Duration unknown. Drivers should expect delays. 

Weekend Downtown Traffic Impacts

Major pavement work in downtown Columbus this weekend has numerous ramps and lanes closed near the 'split.' Be alert if your plans include the I-70-71 corridor. Below is how your commute will be impacted.

71 SB Map

FRIDAY AUGUST 17, 2018

9 PM: I-70 EB reduced to two lanes at Front St. 

10 PM: Broad St. ramp to I-71 SB closes
Detour: Broad St. to 3rd St. to I-70 WB to I-71 SB

11 PM: I-70 EB reduced to one lane at Front St.

11 PM: I-71 SB to I-70 WB closes. Traffic use I-670 WB to SR 315 SB to I-71 SB. 

NOTE: I-71 SB to 70 EB will remain open.

SATURDAY AUGUST 18, 2018

6 AM: All I-70 EB lanes open

10 PM: I-70 WB reduced to two lanes between Miller-Kelton and I-71.

11 PM: I-70 WB reduced to one lane between Miller-Kelton and I-71 NB. All WB lanes must exit to I-71 NB to I-670 WB.

11 PM: I-70 WB to I-71 SB closes. All traffic re-routed to I-71 NB to I-670 WB to SR 315 SB to I-71 SB. 

SUNDAY, AUGUST 19, 2018

6 AM: All lanes and ramps on I-70 WB and I-70 WB to I-71 SB OPEN

MONDAY, AUGUST 20, 2018

5 AM: All lanes and ramps open

Interstate 70 Closed Downtown This Weekend

Interstate 70 EB & WB between SR 315 and I-71 will close this weekend beginning Friday night, September 14 to install steel beams for the new Grant Ave. bridge. 

Eastbound I-70 will reopen Sunday morning, while I-70 westbound will remain closed until 5 AM Monday. A map illustrating the weekend closure is below.

The new Grant St. Bridge is expected to open by Dec. 31 of this year, weather permitting. This is one in a series of ODOT projects to improve the I-70/71 corridor through downtown Columbus.

 

Beam Install Graphic

 

INTERSTATE 70 WEEKEND CLOSURES

At 9 PM FRIDAY SEPTEMBER 14, 2018:

  • I-70 WB will be reduced to two lanes between Miller-Kelton and SR 315
  • Third St. to I-70 EB ramp will close
    Detour: Third St. to Livingston Ave. to I-70 EB
  • Broad St. to I-71 SB ramp will close
    Detour: I-71 NB to I-670 WB to SR 315 SB to I-71 SB.

At 10 PM FRIDAY:

  • I-70 WB will be reduced to one lane between Ohio Ave. and 18th St.
  • I-70 EB will be reduced to two lanes between Hague Ave. and I-71
  • SR 315 SB to I-70 EB ramp will close
    Detour: I-670 EB to I-71 SB to I-70 EB

At 11 PM, the following will close EASTBOUND : 

  • I-71 NB to I-70 EB
    Detour: I-71 NB to SR 315 NB to I-670 EB to I-71 SB to I-70 EB.  For traffic to continue on I-71 NB, take SR 315 NB to I-670 EB to I-71 NB.
  • All lanes of I-70 EB at I-670
    Detour:  I-670 EB to I-71 SB to I-70 EB

Also at 11 PM, the following will close WESTBOUND:

  • All lanes of I-70 WB between I-71 & SR 315 
    Detour: I-71 NB to I-670 WB to SR 315 SB to I-70 WB
  • I-71 SB to I-70 WB
    Detour: I-71 SB to I-670 WB to SR 315 SB to I-70 WB. For traffic to continue on I-71 SB, take I-670 WB to SR 315 SB to I-71 SB.

7 AM SUNDAY SEPTEMBER 16, 2018

  • All lanes and ramps of I-70 EB open

5 AM MONDAY SEPTEMBER 17, 2018

  • All lanes and ramps of I-70 WB open

I-70 East Closed Downtown This Weekend

Interstate 70 east will close this weekend between SR 315 and I-71 for an overlay on the bridge over Short Street. All lanes of I-70 east will be closed from 9 PM Friday until 5 AM Monday.

Coming from the West Side, I-70 EB traffic will be diverted to I-670 EB to I-71 SB back to I-70 EB. The ramps from Broad St., Sullivant Ave., and Mound St. to I-70 EB will remain open, but traffic will be forced to exit to SR 315 NB or I-71 SB.

A map of the closure is below.

I-70 EB Closure

 

INTERSTATE 70 WEEKEND CLOSURES

At 9 PM FRIDAY OCTOBER 5, 2018

I-70 EB will close at I-670. The detour is I-670 EB to I-71 SB to I-70 EB.

The following ramps will close:

  • SR 315 SB to I-70 EB
    Detour: SR 315 SB to I-670 EB to I-71 SB to I-70 EB
  • I-71 NB to I-70 EB
    Detour: I-71 NB to I-670 EB to I-71 SB to I-70 EB
  • Third St. to I-70 EB
    Detour: Third St. to Livingston Ave. to I-70 EB

5 AM MONDAY OCTOBER 8, 2018

  • All lanes and ramps of I-70 EB open.

Stelzer Road between Morse and Sunbury

The northbound and southbound curb lanes of Stelzer Road between Morse Road and Sunbury Road are being replaced, as well as the turn lanes from Stelzer onto Morse.

Traffic cannot get to Morse road from southbound Stelzer. To access businesses along northbound Stelzer:

  • For businesses on the west side of Stelzer Rd, turn at the first light w/o Stelzer (Easton Loop). This is another entrance to the same shopping center, so it allows access to all business on the west side.
  • For businesses on the east side of Stelzer Rd, go north on Stelzer Rd until Transit Dr and access these businesses from that side or come from WB Morse and turn onto Transit Dr. There is one driveway on the east side that is maintained half open which also works to access most of these businesses.

The project is expected to be completed October 26.

(City of Columbus)

Columbus Marathon (10/21) Road Closures

The 39th Nationwide Children's Hospital Columbus Marathon & 1/2 Marathon will take place on Sunday, Oct. 21. Road closures will start Thursday (10/18) in the North Bank Park area.

OVERVIEW: Starting on Thursday, Oct. 18, various roads in the North Bank Park area will be closed to road traffic. On Sunday, Oct. 21, 26.2 miles of the marathon course will be subject to rolling closures, based upon the expected time the first and last athlete passes each mile of the course. 

WHEN / WHERE:        

Thursday, Oct. 18 – Long St. between Neil Ave. to Hocking St. will close at 9:30 a.m.

Friday, Oct. 19

  • Long St. between Neil and Hocking St. (2 lanes only) will re-open from 6 a.m. to 9:30 a.m. for rush hour and then Long St. from Marconi to Hocking will close for the weekend at 9:30 a.m. 
  • Spring St. will be closed from West St. to Hocking St. at 11 p.m.
  • Neil Ave. will be closed south of New Public Way to the combined Start/Finish Line at Long St. at 11 p.m.
  • NOTE: Entrances and exits from all Nationwide parking lots and garages will remain accessible

Saturday, Oct. 20

  • Spring Street will re-open from 3 pm to 11 pm for the Columbus Blue Jackets’ home game; and then will close until 6 pm Sunday

Sunday, Oct. 21

Starting at the start line on Long Street at 7:30 a.m. and for the 26.2 miles of the marathon course and the 13.1 miles of the ½ marathon course, roads will be subject to partial or full closure based upon the expected arrival times of the first and last athlete. Spring Street, Long Street and Neil Ave. will open back up to traffic at 6 p.m.

NOTE: On Sunday, COTA services will be disrupted in the downtown area and rerouted. Please visit cota.com for more details.

More information on the marathon is available at www.columbusmarathon.com.

Marathon Route:

1/2 Marathon Route:

 

I-70 Westbound Downtown Closure Sunday Night

 

 

As the construction season nears completion, crews will shift downtown traffic on I-70 west into its final configuration overnight Sunday.

By Monday morning, drivers will once again have two thru lanes for I-70 west at the I-71 East Split.

In order to shift the lanes and remove overhead signs, I-70 westbound will close at Miller/Kelton from 7 PM Sunday until 5 AM Monday. Traffic will still be able to access the ramp to I-71 NB to I-670 WB to SR 315 SB. The downtown (Mound St) ramp will also be maintained. 

SUNDAY, DECEMBER 2

  • 6 PM: I-70 west is reduced to one lane for thru traffic at Miller/Kelton.
  • 7 PM: I-70 west closed to thru traffic. Downtown exit to Mound St. is open.
    Detour: I-71 NB to I-670 WB to SR 315 SB to I-70 WB
  • 9 PM: I-71 SB is reduced to one lane from Broad St. to I-70 and the ramp from Broad St. to I-71 SB will close. Detour: Broad St. to 3rd St. to I-70 WB to I-71 SB. (Note: Exit ramp to Main St. is OPEN).
  • 5 AM MONDAY: All lanes and ramps open in their final configuration.

(ODOT)

SR 315 South Closure Tonight

State Route 315 southbound will close at I-70 tonight, meaning drivers will not be able to continue south onto I-71.

SR 315 at I-70

  • 8 PM TONIGHT: SR 315 SB will close at I-70 for pavement repairs. DETOUR: SR 315 SB to I-70 WB to Broad St. to I-70 EB to I-71 SB.
  • 8 PM: The ramp from SR 315 SB to I-70 EB will close for pavement repairs. DETOUR: SR 315 SB to I-70 WB to Broad St. to I-70 EB.
  • 5 AM TOMORROW: All lanes open.

All work is weather dependent; it may be postponed or cancelled without prior notice